Removing
1. Remove guide arm 3 (see fig.5.15).
Pic. 5.15. Timing chain tensioner:
1. Timing chain tensioner,
2. Seal,
3. guide roller,
4, 6. Bolt,
5. Bracket,
7. Cover.
2. Set the piston of the first cylinder to the TDC position.
3. Disconnect the wiring connector from the Y75 electronic fuel shut-off valve.
4. Unscrew the bolt 6 of the bracket 5 of the Y75 fuel shut-off valve on the timing chain cover.
5. Remove timing chain tensioner 1.
Installation
6. Installation is made in an order, the return to removal. Replace the seal 2. Fill the timing chain tensioner with engine oil before installation. Install the timing chain tensioner with the stop pin down until it stops. Using a press or punch, slowly press in the thrust pin 7-10 times. Once installed, the tensioner should be compressed slowly and evenly with only a fair amount of force.