Attention! All sealing elements must be replaced without fail!
Expansion valve installation details
9 - Bolts
10 - Expansion valve
11 - Sealing gasket
1. Remove the evaporator cover (see Section Removal and installation of the evaporator of the K / V system and its casing).
2. Remove the gasket (11), - if necessary, prepare a replacement sealing element.
3. Turn out fixing bolts (9) and remove expansion valve (10).
4. Installation is carried out in the reverse order.
5. In conclusion, make sure that the K / V system is working properly.